Home->Product->Stone Crusher Series

Jaw Crusher

jaw crusher
What problems will arise in the process of jaw crusher operation?
Jaw Crusher suddenly mainframe downtime (commonly known as: nausea trucks).
Jaw Crusher output less than the factory standard?
The activities of the jaw broken jaw plate and fixed working hours or the beating of a crash?
Jaw Crusher host slot round, moving jaw functioning normally, but broken cease work?

jaw crusher,jaw crusher plant Jaw Crusher Features:

1. simple structure, easy maintenance;
2. stable performance;
3. even final particles and high crushing ratio.

How to solve the jaw crusher operation of the emerging issues?

Jaw Crusher output less than the factory standard? Exclude method:
1) to replace or increase crusher;
2) replacement motor wiring;
3) nesting I adjusted to the provisions of the said statement nesting chronology for the mouth and increase the crusher;
4) Check teeth-pitch size, such as sub-standard replacement jaw plates must be in tune with the fixed jaw plate and the relative activities of the jaw plates, and ensure that the top gear tooth root, fixed clamping to prevent displacement;
5) increase the voltage at work, in order to meet host override;
6) the replacement of bearings or moving the jaw.

The activities of the jaw broken jaw plate and fixed working hours or the beating of a crash? Exclude method:
1) or tight set of external bolt;
2) align the nesting population to ensure that the correct two jaw plate gap.

Jaw Crusher host slot round, moving jaw functioning normally, but broken cease work? Exclude method:
1) Replacement taut spring;
2) replacement of drawbars;
3) re-installation or replacement of the toggle plate.

Jaw Crusher suddenly mainframe downtime (commonly known as: nausea vehicles) exclusion method:
1) removal of the nesting population plug to ensure a smooth flow of materials;
2) tight belt or replacement;
3) re-installation or replacement of the tight sleeve;
4) for the voltage is at work, to make it compatible with the host operating voltage ;
5) replacement of bearings.

International Dept.1:

Tel: 0086-21-58386126
Fax: 0086-21-58386211

International Dept.2:

Tel: 0086-21-58386138
Fax: 0086-21-58386211